Wireline Logging Guidelines - Quality Control
This articles describes the mains guidelines and quality checks to be performed for successful logging operations
1. Preparation prior to logging operations:
- All wireline logging tools shall be checked and tested prior to rigging up.
- Logging operations shall commence when the hole conditions are stable. A check trip shall be required before running the formation pressure/sampling tool if there were hole problems during the previous run.
- The mud specifications shall meet the program specifications. The overbalance shall be at least 200 psi.
- Fishing equipment . . .