Surveys required before rig move – Offshore

Surveys required before rig move - Offshore Hydrographic Surveys

When  moving into a new location the following  hydrographic surveys are required:

  • seismic
  • sidescan sonar
  • water depth
  • soil analysis.

These surveys are by arranged by the marine supervisor upon the Operations Engineer’s request and are carried out prior to moving a rig onto a new location, or siting a jacket.

Seismic Survey

An acceptable grid definition must be provided for example surveys over 1km2 lines of 1 000 m each (9 in each direction . . .