Squeeze Remedial Cementing

Squeeze Remedial Cementing

The following 3 methods may be used in performing a squeeze cementation: Spot and Squeeze, Straight Squeeze and Circulation Squeeze.

1. The Spot and Squeeze or Block Squeeze method is the term used when cement is spotted over the required interval and the squeeze pressure is applied afterwards in order to force or “squeeze” the cement slurry in the pore space of the formation.

2. The Straight Squeeze method describes the technique where the cement is spotted and squeezed directly into the formation. This method must be used . . .

Restricted Content

Subscribe to view the Content