Site Preparation for Land Wells Planning
On a monthly basis the Drilling Contractor shall be provided with a list of proposed new locations. This list is initiated by Drilling Manager and includes buffer locations to allow for operational flexibility. The Construction Contractor shall plan for:
- access tracks
- cellar construction
- location conductor
- water supply.
Preparation Access Tracks
Preparation of access tracks includes the:
- construction of access tracks to the location
- preparation and levelling of site to accommodate all drilling/workover . . .