Rig move preparation Checklist
The ability to monitor and circulate the well must be retained until the seal flange and lower master valve is installed and pressure tested
-
Mud logging unit must remain to continue monitoring of trip and mud tanks.
- Mud tanks and mud pumps are to be operational until rig release.
A rig site meeting will be held with all relevant personnel. The following points will be addressed:
-
During rig move operations presence of non-essential personnel should be restricted.