Rig Acceptance Standards
This document provides the outline of the minimum requirements for a rig to be accepted for operations on a well location. A rig can be a drilling or work-over rig, snubbing unit, coil-tubing unit, wire-line rig or pulling rig.
GENERAL
1. A detailed rig acceptance procedure shall be included in any Call for Tender and in the rig contract.
2. Prior to the signing of a Well Operations contract or agreement, the Contractor and the Company must have agreed the acceptance criteria.
VITAL RIG EQUIPMENT
1. A . . .