Preparation / Abandonment Checklist

Preparation / Abandonment Checklist

Issues related to the preparation and/or abandonment should be included in the Well Planning Document. These could be related to a new well with or without a conductor installed or could be related to the abandonment of an existing well as a preparation for side tracking.

Conductor

Pre-installed conductors may need to be repaired or replaced.

Talon connector have a reputation of failing and therefore have to be taken out before the new well is drilled.

Issues to address are:

  • Curved conductor or . . .

    Restricted Content

    Subscribe to view the Content