Pre-Spud Drilling Equipment Suface and downhole Inspections
Prior to commencement of each well the Drilling Supervisor with the assistance of the Drilling Contractor Toolpusher shall perform a full rig inspection and record the results on the Company Drilling Rig Inspections Report.
The Drilling Supervisor shall ensure that downhole and surface equipment inspection requirements are met prior to and during drilling activities.
Downhole Equipment Requirements
It is a requirement for downhole equipment that:
- drilling tools and equipment for each hole section shall be on hand, inspected and in serviceable condition prior to . . .