Pre-spud Documentation Requirements
The documentation listed below must be available at the rig site prior to commencing the operations:
- Concurrent Drilling Completions and Production Operations (if applicable)
- Emergency Response Manual
- Wellhead Manual
- Drilling Operations Manual
- Signed copy of the Drilling/Completion Programme
- Code and Cost Manual
- General Data in Daily Reporting System
- Medivac Procedures
- Handover certificate
- HSE Manual