Pre-spud Checklist # 4
- Drains clear to flow to rio negro
- Ditches between pits to grout with old cement
- 42” pipe cut approx 0.3m above bottom of cellar and cellar cut where necessary to assist flow
- Cellar clean, cellar jet installed & discharge line to shakers, sufficient slope for cutting removal
- Mouse and rathole in place
- Chicksans connected to stand pipe, at subbase
- D-gasser hooked up
- All stairs, walkways on mud tanks installed, level
- Trip tank pump functional