Pre-spud Checklist # 4

Pre-spud Checklist # 4

  • Drains clear to flow to rio negro
  • Ditches between pits to grout with old cement
  • 42” pipe cut approx 0.3m above bottom of cellar and cellar cut where necessary to assist flow
  • Cellar clean, cellar jet installed & discharge line to shakers, sufficient slope for cutting removal
  • Mouse and rathole in place
  • Chicksans connected to stand pipe, at subbase
  • D-gasser hooked up
  • All stairs, walkways on mud tanks installed, level
  • Trip tank pump functional
  • Restricted Content

    Subscribe to view the Content