Pre-spud Checklist # 3

Pre-spud Checklist # 3

- weatherford – 2 tongs & power units. Both 20” and 13/38

- rio negro grouted

- drains / channels preferably clear prior to spotting equipment

- 40” casing to cut. And corregate walls on cellar, cut out

- cellar to empty to locate the flyge pump sump. Install pump and hook up same

- mouse hole and rathole, in place

- pipe bins in place

- casing in place and strapped. All casing running tools ready

- chicksans connected to stand pipe, at subbase

- flare line . . .

Restricted Content

Subscribe to view the Content