Pre-spud Checklist # 3
- weatherford – 2 tongs & power units. Both 20” and 13/38
- rio negro grouted
- drains / channels preferably clear prior to spotting equipment
- 40” casing to cut. And corregate walls on cellar, cut out
- cellar to empty to locate the flyge pump sump. Install pump and hook up same
- mouse hole and rathole, in place
- pipe bins in place
- casing in place and strapped. All casing running tools ready
- chicksans connected to stand pipe, at subbase
- flare line . . .