Pre-spud Checklist # 1
- the rig has to be moved during the defrosting period (March-April), gravel or slabs must be used for the road.
- The mast will have been inspected after laying down on the previous location to avoid unnecessary delays if repairs are required.
- The cellar should have been constructed and the 36” phase drilled, with the 30” set @ 10-12 m below ground level (and possibly the 20” pre-set). Confirm data with Superintendent.
- Check that the conductor is vertical, by means of an electronic laser level device . . .