General BOP Arrangement A Blow Out Prevention (BOP) stack is installed on a wellhead to…
latest
-
-
Choke and Kill System The choke and kill system shall provide the valves and piping…
-
Kick Detection and Well Monitoring Equipment Kick detection and well monitoring equipment shall be supplied…
-
EquipmentTechnicalWell Control
Application and maintenance of secondary well control equipment
by adminby adminApplication and maintenance of secondary well control equipment The following recommendations refer to the application…
-
Well Control Drills In order to train the drill crew in the procedures that apply…
-
PlanningTechnicalWell Control
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
by adminby adminCalculation of Maximum Allowable Annular Surface Pressure (MAASP) The Maximum Allowable Annular Surface Pressure (MAASP)…
-
Responsibilities for Well Control Primary well control shall be maintained at all times. In the…
-
Well Control Responsibilities On both Company and Contractor-owned drilling and workover rigs (regardless of the…