Multilateral drilling programme

Multilateral drilling programme 1. introduction

The purpose of this outline program is to set the framework for the operations.

This programme will prepare the existing well, for a forthcoming near horizontal multilateral side-track which is due to begin immediately upon the successful completion of the abandonment.

The existing completion will be retrieved from the wellhead down to the ELTSR which is located just above the production packer. After setting the 'ML' packer and whipstock the well will be sidetracked out of the 9 5/8" casing.

Side-track

A 8 . . .

Restricted Content

Subscribe to view the Content