Kicks with Casing in the BOP Stack

Kicks with Casing in the BOP Stack

Well control precautions to be used when running casing.

  • Change the rams to the casing size (on surface stack) and test the BOP bonnets.
  • Prepare a circulating head.
  • Ensure a cross-over from casing to drill pipe is available to allow the string to be hung off if needed.
  • Take care while filling up the casing. Use clean mud and ensure that junk does not fall into the casing.
  • Record the annular volume between the casing and open hole and Outer . . .

    Restricted Content

    Subscribe to view the Content