Installation procedure for Prepacked Screens in Horizontal Open Hole Section

Installation procedure for Prepacked Screens in Horizontal Open Hole Section

These example procedures are based on a balanced rotationally locked washdown system.

-   The following procedures assume the open hole horizontal section to have been drilled with sized  calsium carbonate in polymer / brine based fluid.

-   It should be considered to condition the open hole section by a wiper trip prior to pulling out and displace the hole to fresh mud giving a minimum safe overbalance.

Running Procedure

1. Displace the hole from 0m - 350m riser to clear filtered 1 . . .