Hole Conditioning before Running Casing or Liner

Hole Conditioning before Running Casing or Liner

The hole conditioning guidelines described in this article should be adhered to in order to safely and successfully run the casing/ liner into the open hole.

Structural Casing

Driven or pre-installed: No hole conditioning necessary

Conductor Casing

  • Hole section drilled with seawater/high viscosity sweeps/native clay system with returns to sea bed
  • At casing point circulate and condition the mud at the maximum rate until shakers are clean, gas levels are acceptable and mud is in specification
  • Sweep the hole with . . .

    Restricted Content

    Subscribe to view the Content