General Liner Cementation Procedure
Procedure for single stage cementing operations whith an ES cementer and ECP installed:
- Prepare 30 bbls spacer 500 (10.5 ppg) in slug pit as per mixing procedure, while circulating.
- Set the hanger as per setting procedure, bleed off pressure to 0 psi, then presure test casing to 2500 psi for 10 mins.
- Increase pressure in stages to 2000 psi to inflate the ECP.
- Continue increasing pressure to 2750 psi to open the ES cementer.
- When ES cementer is opened, circulate hole clean.