Drilling 16 inch Section – Best Practices

Drilling 16 inch Section - Best Practices

  • Hold a pre-job safety meeting on BHA make up.

  • Make up 16” BHA as detailed in well specific programme.
  • Ensure a ported float is included in the string.
  • Circulate through the BHA and report weight in DDR.
    • Note: If a conventional motor steering assembly is to be used, ensure that the Directional Driller witnesses the correct toolface offset being entered into the MWD computer and a sign off form completed.
    • RIH with 16” BHA and tag stab-in . . .

      Restricted Content

      Subscribe to view the Content