Coring Preparation Checklist/ Best Practices
- Operations Engineer to organise pre-job planning meeting at the rig site, with rig and office personnel to discuss the job objective and hazards.
- Sections are picked up in 30-foot lengths, so the steps outlined should be multiplied for a given core barrel length.
- Check if hole conditions allow run 81 meter core barrel.