Checklist: Driling 12.25" section

  • Test plug ready
  • Install wear bushing
  • Float valve installed
  • BHA on racks and strapped
  • Stabilizers, jars strapped and ready to RIH. Check jar hours
  • Bits, nozzles, tools and breaker on location
  • Bit hand on location
  • OBM weighted up
  • Get 9 5/8” csg on location, strap, drift, clean and dress. Have bakerlock on location
  • Back load 13 3/8” csg
  • Make sure Weatherford are on location and ready 1 day prior . . .