Cementing Checklists

Cementing Checklists PRE-JOB Checklist

  • Water sample sent to town for analysis
  • Pre-job safety brief held with all parties
  • Bottom hole temperature from logs consistent with norm and relayed to cementing Company
  • Caliper run.  Is hole under/in/overgauge
  • Casing drifted, threads clean, consumables in place as per program
  • Strokes to bump
  • Plan to monitor returns/ losses
  • Contingency for losses - minimum turbulent flow, maximum laminar flow
  • Open-hole excess volume determined
  • Cement and additive stocks sufficient
  • Restricted Content

    Subscribe to view the Content