Casing running checklist

Casing running checklist

  • Wear Bushing retrieved
  • Pre-job safety brief held with all parties
  • Back up float and shoe equipment in store or easily available
  • All float equipment is PDC drillable and written on the tools
  • Tailing device available if required
  • Casing crew checked out tongs/power pack
  • Bakerlock/wire brush/barite available on rig floor
  • Float equipment checked out  Floats to be run in self-fill mode or not  Tabs/wedges removed if not to be run in self-fill mode . . .

    Restricted Content

    Subscribe to view the Content