Casing running checklist
- Wear Bushing retrieved
- Pre-job safety brief held with all parties
- Back up float and shoe equipment in store or easily available
- All float equipment is PDC drillable and written on the tools
- Tailing device available if required
- Casing crew checked out tongs/power pack
- Bakerlock/wire brush/barite available on rig floor
- Float equipment checked out Floats to be run in self-fill mode or not Tabs/wedges removed if not to be run in self-fill mode . . .