Application and maintenance of secondary well control equipment

Application and maintenance of secondary well control equipment

The following recommendations refer to the application and maintenance of various types of other well control equipment: chole manifold,  

Inside pipe shut-off tools, Mud-gas separator and trip tank, Mud pit level indicator and recorder,c High pressure mud and cement system, Storm chokes.

1 Choke manifold

For working pressure ratings over 13,800 kPa (2000 psi), the choke manifold shall be constructed in accordance with Company's procedure.

Alternatively, a choke manifold as already installed by the owner of the drilling . . .

Restricted Content

Subscribe to view the Content