Abandonment programme – oil producer

Abandonment programme - oil producer Objective:

To abandon the well in a safe manner permitting the removal and restoration of the location.

Workover number: xxx

Min. required hoist capacity: T 93

Estimated time : 2.5 days Estimated start date :

Account code :

Well history:

The well was drilled in xxx and was completed as an oil well. An Outside Liner repair was carried out in xxx. The well was closed in due to high water-cut in xxx. In xxx, the well was suspended with gravel, cement and a killstring.

Restricted Content

Subscribe to view the Content