Site Restoration
After completion of the drilling operation by the drilling rig, the well is suspended.
The following possibilities exist:
- The well will be re-entered within a short period by the work over rig to install a completion. The duration varies from within one week to several months after rig release.
- The well will be re-entered by a drilling or work over rig at a later time to continue well operations (side-track, completion, deepening, abandonment, etc.). This period between rig entries can vary from several months to many years . . .