Coiled Tubing Standards

Coiled Tubing Standards

Minimum standards, which must be complied with and specifies general practices that enable the planning, safe and successful execution of coiled tubing operations.

PLANNING

1. Coiled tubing operations on live wells need a very thorough preparation and essential parameters have to be taken into consideration during the preparation.

2. Last drift run done in the well if the operation takes place in a production well. Note that if the last drift run is older than 6 months and if the well has produced since, a new drift run and top sediment run . . .

Restricted Content

Subscribe to view the Content