Responsibilities for Well Control
Primary well control shall be maintained at all times. In the event secondary control becomes necessary, the well shall be brought back under control as safely as possible.
For each well control operation all personnel shall have a pre-assigned task appropriate to their function. All personnel shall also ensure familiarity with Company well control procedures.
The well control responsibilities during well killing operations are given in the following table.
Activity
Execution
Quality Control . . .