Cementing Checklists PRE-JOB Checklist
- Water sample sent to town for analysis
- Pre-job safety brief held with all parties
- Bottom hole temperature from logs consistent with norm and relayed to cementing Company
- Caliper run. Is hole under/in/overgauge
- Casing drifted, threads clean, consumables in place as per program
- Strokes to bump
- Plan to monitor returns/ losses
- Contingency for losses - minimum turbulent flow, maximum laminar flow
- Open-hole excess volume determined
- Cement and additive stocks sufficient