Checklist wireline packer running operations

Checklist wireline packer running operations

  • Do you need an electrician? Somebody must shut off th egenerators from the time the head is connected to the time the packer is 100 m below RT. Radio silence is also required. Thesame procedure should be applied when POOH.
  • Generaly, no gauge ring is run if a scraper has been used. If another packer was set previously, the zone is likely tohave been damaged. Do not run your packer in front of thiszone even if the zone has been cleaned by the scraper.
  • Never run your . . .