Coring Preparation Checklist/ Best Practices

Coring Preparation Checklist/ Best Practices

  • Operations Engineer to organise pre-job planning meeting at the rig site, with rig and office personnel to discuss the job objective and hazards.
  • Sections are picked up in 30-foot lengths, so the steps outlined should be multiplied for a given core barrel length.
  • Check if hole conditions allow run 81 meter core barrel.
  • Do not . . .

    Restricted Content

    Subscribe to view the Content