7” liner running procedure

7” liner running procedure

  • Hold Toolbox talk on rig floor, to advise all rig-personnel involved of the objectives, summary of the running procedure, and to discuss any particular care or safety concerns.
  • Company Man and Mud Logger to prepare Liner Weight + Metal Displacement Diagrams.
  • Pick up shoe-track sub assemblies and perform floating equipment test.
  • Install pip tags in liner joints, as per programme. The pip tags should be wrapped with Teflon tape prior to DOPE and M/U.
  • Pick up the Liner Hanger assembly very carefully to avoid . . .

    Restricted Content

    Subscribe to view the Content