13 3/8” Casing Preparation and Running Checklist
- Before running the 13-3/8” casing, make sure that the rig is correctly aligned with the rotary table centred over the wellhead (note: the DP will now be racked back so the weight distribution from when drilling will have changed). This is to prevent damaging the wellhead at seal area. This can be done when jetting wellhead.
- Check all equipment is on-site and in good condition.
- Gauge the OD of the casing drift provided by Weatherford and confirm with the Operations Engineer that the . . .