Rig move preparation Checklist

Rig move preparation Checklist

The ability to monitor and circulate the well must be retained until the seal flange and lower master valve is installed and pressure tested

  • Mud logging unit must remain to continue monitoring of trip and mud tanks.

  • Mud tanks and mud pumps are to be operational until rig release.

A rig site meeting will be held with all relevant personnel. The following points will be addressed:

  • During rig move operations presence of non-essential personnel should be restricted.