Tubing running and testing

Tubing running and testing

The following installation considerations apply to all threaded connections if mishaps are to be avoided:

  • drift check and inspect connections before running;
  • properly apply correct thread dope;
  • backout and re-inspect connections that are stabbed in misaligned position;
  • avoid high makeup speeds and use correct torque;
  • use pup joint, couplings and cross-overs of the same tubular material, especially in CRA applications;
  • additional makeup turns increase 8-round connection leak resistance in tension;
  • additional torque reduces tendency of tubing to . . .

    Restricted Content

    Subscribe to view the Content