General completion design considerations

General completion design considerations

The well completion typically includes the perforations, sand exclusion system, (liner), tubing, wellhead, tubing accessories, packers, associated safety equipment and Xmas tree.

The perforations, gravel pack etc. provide the 'inflow system' into the well structure, while the tubing with flow controls, safety devices for isolating the reservoir, the Xmas tree and, where necessary, artificial lift or pressure boosting facilities, provide the 'outflow system' (well conduit) within the well structure.

1. General completion design considerations

Well and completion design must take into consideration the following requirements:

  • artificial lift needs . . .

    Restricted Content

    Subscribe to view the Content