Contents of the Cement Programme
The Cement Programme gives a detailed description of any non standard operations which are proposed. It shall also outline risks involved and precautions to be taken. (Reference shall be made to the Drilling Programme as appropriate.)
Well Status Previous Casing
The Cement Programme shall include:
- diameter (inches)
- weight (lbs/ft)
- grade
- coupling
- shoe measured and vertical depth (ft)
- leak-off test value (ppg).
Hole Size
The Cement Programme shall include:
- hole diameter (as . . .