Setting a Magna + cement plug – Best Practices

Setting a Magna + cement plug - Best Practices

  • Operations Engineer to organise pre-job planning meeting at the rig site, with rig and related service personnel to discuss the job objective and hazards.
  • Check pipe tally correctly (lengths & sizes).
  • Check volumes based on open hole, casing size(s); cement string and drill pipe.  Confirm type of fluid in hole and actual bottom hole temperature.  Communicate all data to rig personnel.
  • Ensure thickening time for Magna+ / cement slurry checks are correct and slurry compatibility test is done.
  • Check displacement . . .

    Restricted Content

    Subscribe to view the Content