Running Casing with Weatherford Overdrive system - Best Practices Rig up checklist
- Rig down the rig elevator and bails, make sure the iron roughneck has been laid out
- Remove the saver sub using the pipe handler of the top drive (rig procedure). Check the make-up torque setting of the pipe handler prior to removing the saver sub. Verify that the pipe handler stays inline with the top drive main shaft.
- Ensure that the top drive shaft is aligned with the rotary table centre. Ensure that the pipe handler is dressed correctly to grip the . . .