4 1/2″ Liner running programme

4 1/2" Liner running programme

1. Hold safety meeting with crews before starting running the liner and report in iadc.

2. Make up plug dropping head on drifted single and lay in v door.

Prepare 10m of chicksan lines.

3. Make up and bakerlock shoe track. Test floating equipment

Make up torques:

Min      ft.lbs

Opt      ft.lbs

Max     ft.lbs

Rih 4 1/2" liner according to . . .

Restricted Content

Subscribe to view the Content