06. Well Testing – Equipment preparation

06. Well Testing - Equipment preparation 1 Introduction

It is usual to contract out Well Testing Services, including the inspection, testing, drifting of equipment in base workshops and on site.

The effort and time spent to ensure the integrity of each individual component used downhole and on surface will impact on the success of a well in minimising downtime. The thorough inspection on site, before and after use is strongly recommended.

2 Subsurface equipment

2.1 Tubing

When testing to 5000psi, it is generally sufficient to use tubing that is the preferred type used . . .

Restricted Content

Subscribe to view the Content