02. Well Testing - Production test objectives 1 General
Test objectives can vary from a single downhole sample to an extensive long duration reservoir limit test. This will form part of the well programme.
Stimulation and artificial lift are two methods of getting the well to flow; special provision may be required for these.
The purpose of a production test is to record the bottom-hole and wellhead pressures at a number of production rates, and simultaneously record the corresponding gas, condensate or oil rates. The main objectives of a test (including fluid sampling) of the . . .