Mud Logging General Guidelines
A fully equipped computerised mud logging unit shall be available for recording and monitoring well generated data, for all exploration wells. There is no mandatory requirement for a full Mud Logging service for development wells which are not designated HTHP wells.
Requirements
The general requirements for the mud logging service to be provided are included in the contact:
- monitoring
- pore pressure prediction
- geological services
- logs/reports
Additional evaluation required by the Drilling Department or by the Petroleum Engineering Department shall be . . .