7” Liner Running Preparation checklist

7” Liner Running Preparation checklist

  • Pre-job planning meeting with all key personnel.
  • Reference Manufacturer Operations Guidelines.
  • Discuss with LWD coordinator during pre-phase meeting regarding download memory data from LWD on last run to lay down tool instead of leaving tools hanging.
  • Check if modified thread compound in compliance with API 5A3 (e.g. Lube Seal API Modified) is available as it is recommended to be used during winter season, it is required the use of a power tong equipped with load cell and hydraulic fluid suitable for extreme cold weather . . .