7” Liner – Cementing Preparation and Procedure Checklist

7” Liner - Cementing Preparation and Procedure Checklist

  • Hold pre-job planning meeting. All equipment to be checked and personnel familiar with the plan.
  • The final cement programme to be issued to the rig and approved by the Drilling Superintendent.
  • Ensure that BJ needs to blow out water from the lines after performing pressure test to avoid frozen the lines if job is carried out in cold weather.
  • Before cement job begins, ensure that the cement is fluffed and transferred from one tank to another tank to make sure it would transfer in . . .

    Restricted Content

    Subscribe to view the Content