6in Section Drilling – Best Practices

6in Section Drilling - Best Practices

  • Drilling Engineer to organise pre-section meeting at the rig site, with rig and office personnel to discuss section objectives and hazards.
  • Gauge of all stabilizers will be checked prior to making up the BHA. Prior to RIH, the Drilling contractor will provide an accurate BHA report including serial numbers and dimensions of all the components.
  • If a steerable motor is used, the bent and the tool face offset must be verified by the DD, MWD Engineers and the Drilling Supervisor.  The tool face offset must correctly be . . .

    Restricted Content

    Subscribe to view the Content