36" hole section preparation - Checklist
- Ensure derrick is level
- 36” bit on floor
- Sufficient 9” drill collars, on rack, strapped (with top drive picked up prior spud)
- Sufficient 8 ½” drill collars, x/o to reach csg point on rack, strapped
- 10 stands 5” drill pipe made up and in derrick
- 2 stds HWP drill pipe in derrick, pup jts available for space out.
- 2 x Stabilisers 36” x 2 and pony DC ready, strapped ( if not one piece)
- Ultra seal pill mixed 30 . . .