20” Casing Operations Checklist

20” Casing Operations Checklist

  • Ensure a circulating swedge is available for washing down the hole.

  • Ensure the casing tongue HT100 are on the floor together with the correct size jaws.
  • The stab-in shoe should have been installed on 20” casing joint.
  • Casing will be cemented using an inner string. Check that the centraliser, stinger string and correct back up seals are available.
  • Confirm the stinger threads are . . .