13 3/8” Cementing Program Checklist

13 3/8” Cementing Program Checklist

  • Perform tool box talk.
  • Ensure the information below is known before starting the 13 3/8” cement job:
    • The expected stand pipe pressure and ECD at different stages of the cement job.
    • The predicated fracture gradient at the 13 3/8” shoe.
    • The required 13 3/8” casing pressure test.
    • The minimum flow rate required to achieve turbulent flow.
    • The design temperature (confirm with Ops Eng).
  • If using the OverDrive system must be laid down and . . .