13 3/8” Casing - Wellhead and BOP Operations - Best Practices
- After cementing operation on the 13 3/8" section. Do not attempt to back out the landing joint to let fluid out. The normal procedures consist of cutting two holes and letting the fluid drain and then proceed with cutting the casing.
- Rough cut 13 3/8” casing. Refer to the manufacturer installation procedures.
- Remove landing joint and diverter stack.
- Final cut 13 3/8” casing. Dress cut, and install casing seals . . .